Record Details

Title:
Experience gained during the Commissioning of the Undulator Control System at the European XFEL
Affiliation(s):
EuXFEL staff
Author group:
Undulator Systems
Topic:
Scientific area:
Abstract:
The European XFEL is a fourth-generation light source, which will start the operation in spring 2017. Three undulator systems - SASE 1, SASE 2 and SASE 3 - will be used to produce photon beams. For operation of all undulator systems, a total amount of 91 undulators have been produced and commissioned. SASE 1 and SASE 3 undulator systems, consisting of total 56 undulator cells, have been installed and prepared for the operation in the tunnel in spring and summer 2016. SASE 2 will be installed by the end of 2016. This paper describes the commissioning process of the whole undulator control system and reports about the experience gained over the entire duration of undulator control system commissioning.
Imprint:
2016
conference Information:
Proceedings of PCaPAC2016, FRITPLCO04 (2016)
ISBN:
978-3-95450-189-2
Language(s):
English
Conference information:
11th International Workshop on Personal Computers and Particle Accelerator Controls, Campinas, 2016-10-25, 2016-10-28, PCaPAC2016


Export


 Record created 2017-03-01, last modified 2019-01-30

Fulltext:
Download fulltext
PDF

Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)